GC08-0 Supplementary vocabulary
GC08-0 Response time
GC08-0 is a supplementary CPV code meaning Response time. It is added alongside a main CPV code to qualify it - a material, a purpose, a target group - and never replaces it.
This CPV code in every EU language
Response time
English (EN)
Време за отговор
Български (BG)
Doba odezvy
Čeština (CS)
Svartid
Dansk (DA)
Ansprechzeit
Deutsch (DE)
Χρόνος απόκρισης:
Ελληνικά (EL)
Tiempo de respuesta
Español (ES)
Reageerimisaeg:
Eesti (ET)
Vasteaika
Suomi (FI)
Délai de réaction
Français (FR)
Vrijeme odziva:
Hrvatski (HR)
Reakcióidő:
Magyar (HU)
Tempo di risposta
Italiano (IT)
Atsako trukmė
Lietuvių (LT)
Atbildes laiks
Latviešu (LV)
Iż-żmien tar-reazzjoni
Malti (MT)
Reactietijd
Nederlands (NL)
Czas reakcji:
Polski (PL)
Tempo de resposta
Português (PT)
Timp de reacţie
Română (RO)
Čas odozvy/oneskorenie
Slovenčina (SK)
Odzivni čas
Slovenščina (SL)
Svarstid
Svenska (SV)
Commission Regulation (EC) No 213/2008 - official wording for GC08-0.
Section GC (34)
| Code | Description |
|---|---|
| GC01-9 | Not exceeding |
| GC02-2 | In excess of |
| GC03-5 | A maximum of |
| GC04-8 | A minimum of |
| GC05-1 | Phase: |
| GC06-4 | Rating: |
| GC07-7 | Reference: |
| GC09-3 | Rooms: |
| GC10-6 | Scale of work: |
| GC11-9 | Specifications: |
| GC12-2 | Subsidiary lot: |
| GC13-5 | Type: |
| GC14-8 | Type of architecture: |
| GC15-1 | Type of protocol: |
| GC16-4 | Type of standard: |
| GC17-7 | Dwellings: |
| GC18-0 | Lots: |
| GC19-3 | Lot No |
| GC20-6 | Main lot: |
| GC21-9 | Area: |
| GC22-2 | Commissioning in |
| GC23-5 | Lengthening |
| GC24-8 | Whole |
| GC25-1 | Number: |